|
Here's a tip for putting the heads on. They are heavy and hard to aim - and the heat shield tends to grab the gasket edge. A slip sheet works great.
Put the new gasket on the block over the dowels - then make a cardboard slip sheet to lay over the new gasket - put a couple notches at the bottom for the dowels. Now put the front lower head bolt in the head and lift it into place, aiming the front lower corner of the head so the bolt goes thru the dowel. Rotate the head and lower it until both dowels are engaged - then pull out the slipsheet before jiggling the head down on the dowels.
My project has turned the corner - heads are back on. There's some minor reconstruction to do on the stay at the back end of the y-pipe, then put on a new water pump and bolt it all back together.
Last edited by rb95gs : 02-18-08 at 06:09 PM.
|