I have to mount magnets around the crank pulley, after machining holes, after measuring every 120 deg. exactly, after scribing a perfect circle from the centerline..... it's all coming back to me now.
Anyway, I just got done drilling the holes, and the manual tells me to use 5-minute epoxy to hold the magnets in the hole. I just thought it was funny.
Now I'm fabricating a bracket for the crank sensor, and I'm having too much fun. It's definitely getting done this weekend if I can manage the work hours. The injectors just arrived, too, and that was all that was left to get after this kit....
well, that and a turbo
